Renault Megane II - the Repair manual and operation
1. Operation and maintenance of the car
2. Engine
2.1. General procedures of technical service
2.2. Mechanical part of the engine
2.2.1. Removal and installation of the pallet of a case of the engine (K4J, K4M engines)
2.2.2. Removal and installation of a multipurpose arm (F4R engine)
2.2.3. Removal and installation of a belt of the drive of auxiliary units (K4J, K4M engines)
2.2.4. Removal and installation of a belt of the drive of auxiliary units (F4R engine)
2.2.5. Removal and installation of a belt of the GRM drive (K4J engine)
2.2.6. Removal and installation of a belt of the GRM drive (F4R engine)
2.2.7. Removal and installation of the power unit (K4M engine)
2.2.8. Removal and installation of the power unit (F4R engine)
2.2.9. Removal of laying of a head of the block of cylinders (K4J, K4M engines)
2.2.10. Dismantling, check and assembly of a head of the block of cylinders (K4J, K4M engines)
2.2.11. Dismantling, check and assembly of the block of cylinders (K4J, K4M engines)
2.2.12. Installation of laying of a head of the block of cylinders (K4J, K4M engines)
2.3. Fuel system
2.4. System of injection
2.5. System of an admission and release
2.6. System of start and charging
2.7. Cooling system
2.8. System of decrease in toxicity
2.9. System of production of the fulfilled gases
2.10. Appendix 1
2.11. Appendix 2
2.12. Tables
3. Transmission
4. Running gear
5. Steering mechanism
6. Brake system
7. Onboard electric equipment
8. Body
9. Schemes of electric equipment
2.2. Mechanical part of the engine
Removal and installation of the pallet of a case of the engine (K4J, K4M engines)
Removal
Installation
Removal and installation of a multipurpose arm (F4R engine)
Removal
Installation
Removal and installation of a belt of the drive of auxiliary units (K4J, K4M engines)
Removal
Installation
Removal and installation of a belt of the drive of auxiliary units (F4R engine)
Removal
Removal and installation of a belt of the GRM drive (K4J engine)
Removal
Installation
Belt tension
Check of installation of phases of gas distribution and tension of a belt of the GRM drive
Removal and installation of a belt of the GRM drive (F4R engine)
Removal
First installation of phases of gas distribution
Second installation of phases of gas distribution
Check of a tension of a belt
Installation
Removal and installation of the power unit (K4M engine)
Removal
Installation
Removal and installation of the power unit (F4R engine)
Removal
Installation
Removal of laying of a head of the block of cylinders (K4J, K4M engines)
Removal
Cleaning of a head of the block of cylinders
Check of a privalochny surface of a head of the block of cylinders
Dismantling, check and assembly of a head of the block of cylinders (K4J, K4M engines)
Removal of valvate springs
Check of height of a head of the block of cylinders
Check of tightness of a head of the block of cylinders
Check of diameters of basic necks and openings of support of camshafts
Check of axial movement of camshafts
Check of valves
Check of a gap between cores and the directing plugs of valves
Check of valvate springs
Assembly of a head of the block of cylinders
Dismantling, check and assembly of the block of cylinders (K4J, K4M engines)
Removal of nozzles for cooling of the bottoms of pistons
Cleaning of the lower part of the engine
Check of the privalochny plane of the block of cylinders
Check of diameter of support of radical bearings of a bent shaft
Check of diameter of radical necks
Check of diameter of conrod necks
Removal of piston fingers
Check of a gap between piston rings and flutes of the piston
Check of gaps in the lock of piston rings
Installation of nozzles for cooling of the bottom of the piston
Installation of nozzles of cylinders 2 and 4
Direction of installation of inserts of radical bearings of a bent shaft
Installation of inserts of radical bearings in a bed of the block of cylinders
Installation of inserts in covers of radical bearings
Check of a diametrical gap between radical necks of a bent shaft and bearings
Check of axial movement of a bent shaft
Installation of inserts of conrod bearings
Assembly of rods with pistons
Preparation of piston fingers
Installation of position of pistons in relation to rods
Assembly of the piston and rod
Installation of piston rings
Assembly of the lower part of the engine
Installation of epiploons of a bent shaft
Installation of laying of a head of the block of cylinders (K4J, K4M engines)
Procedure of an inhaling
Replacement of epiploons of camshafts
Installation of epiploons of the camshaft of inlet valves of the first option of execution
Installation of an epiploon of the camshaft of final valves