2.2.6.5. Installation
Establish the lower and top covers of the GRM drive.
ATTENTION
Surely replace a bolt of fastening and a pulley of a bent shaft.
|
Block an engine flywheel the big screw-driver.
Tighten a bolt of fastening of a pulley of a bent shaft the moment (40 N · m, then tighten on 110 °+10 °).
ATTENTION
Not to damage a pulley of a bent shaft, do not start the engine if the belt of the drive of auxiliary units is not established.
|
Establish a belt of the drive of auxiliary units.
Establish an opening stopper under a clamp of the top dead point, having put a small amount of sealant.
Establish new caps of the camshaft of inlet valves and the camshaft of final valves.
Installation of other components is made as it should be, the return to removal.