49909390

2.2.3.2. Installation

Clear a brush of deposits streams of a pulley of a bent shaft.
Establish a tension roller.
Tighten the required moment (40 N · l) a bolt of fastening of a tension roller.

Fig. 2.39. Free stream



ATTENTION
The belt of the drive of auxiliary units has five streams, and a conditioner compressor pulley – six streams. At installation of a belt be convinced that the stream shown by an arrow in the figure 2.39 remains free.

Establish a belt of the drive of auxiliary units.
For the correct installation of a belt of the drive of auxiliary units on pulleys turn a bent shaft of the engine on two turns.
You make installation as it should be, the return to removal.
Connect the rechargeable battery.