49909390

3.12.2. Safety measures in operating time with automatic transmissions

Towage
The applied oil
Oil discharge



1. The automatic transmission in the block with the main transfer consists of high-precision details that demands careful check them before repeated assembly because even small scratch can cause leak of working liquid or affect performance data. Instructions on repair are organized so that you at the same time worked only with one group of elements. It will help to avoid confusion from similar details of various subsystems which are at the same time in your workplace. Survey and repair of groups of elements begins with the party of the case of the converter. Examine, restore and repeatedly bring together them before you pass to the following group of elements. If at repeated assembly in a certain group of elements you find defect, immediately examine and repair this group. In the absence of an opportunity at once to bring together group of elements (you expect the ordered details, etc.) place all details of group in a separate container.
2. All sorted parts have to be washed up, all channels and openings – are blown by compressed air.
3. Dry up all details compressed air, never use rags.
4. When using compressed air do not direct a current of air to yourself to prevent casual hit of working liquid or kerosene on the person.
5. Clear details only the recommended working liquid for automatic transmissions or kerosene.
6. After cleaning of a detail arrange in the correct order for ensuring effective check, repair and repeated assembly.
7. When dismantling the case of valves you store each valve together with the corresponding spring.
8. Place new disks for brake mechanisms and couplings which will be used for replacement before repeated assembly in the container with working liquid, at least, for 15 min.
9. Cover all sealing rings, disks and plates of coupling, the rotating parts and the surfaces of friction before repeated assembly with working liquid.
10. Replace all laying and rubber sealing rings new.
11. You do not apply sealants on laying and similar details.
12. Make sure that the ends of a spring ring do not coincide with one of cuts and are established in deepening correctly.
13. When replacing the worn-out plug also replace the subsystem supporting this the plug.
14. Check persistent bearings and their paths for existence of wear or damages. Replace in case of need.
15. Use vaseline for mutual fixing of details.
16. During the work with material of the laying which is finally formed in working situation you have to execute the following operations procedure.
Using an edge and a scraper, remove all old pro-masonry material from the condensed surface.
Carefully clear all elements of the removed pro-masonry material. Clear both condensed surfaces the solvent which is not leaving marks.
Carry out repeated assembly within 10 min. after imposing of pro-masonry material on the condensed surface. Otherwise pro-masonry material has to be removed and replaced by new.