49909390

8.3.3. Replacement of the external directing ledge

Fig. 8.23. Removal of a naprvlyayushchy ledge: 1 – clamps


Disconnect clamps and remove the directing ledge (fig. 8.23).

Replacement of buffers
Remove the central plastic rivet. Drill four rivets.

Fig. 8.24. Removal of the buffer


Remove the buffer (fig. 8.24).

Installation
Installation is made as it should be, the return to removal.